weekly report (internship)

Weekly Project Plan

Student Name: Ayoub Yousef

ID: k-91361790

Week number: 1

Objective(s)

To repair faults and upgrade external hardware to improve performance.

Result(s) desired

To be able to identify all faults in external hardware of scanners and printers and fixing them to restore the performance of these equipment.

Work Done

Servicing of scanners, printers and other equipment.

Problems/Remarks

Some scanner and printer parts could only be provided by the manufacturer of the equipment, which meant that the repair had to be finished later.

Next Objective(s)

To ensure that all computers and other devices in the company are surge-protected.

Supervisor Signature:……………………………. Student Signature:…………………………….

Weekly Project Plan

Student Name: Ayoub Yousef

ID: k-91361790

Week number: 2

Objective(s)

To ensure that all computers and other devices in the company are surge-protected.

Result(s) desired

To protect all the equipment operated in the company against voltage surges.

Work Done

Installing surge protection devices and connecting equipment.

Problems/Remarks

No problem was encountered during this activity.

Next Objective(s)

To set up new computers and IT systems.

Supervisor Signature:……………………………. Student Signature:…………………………….

Weekly Project Plan

Student Name: Ayoub Yousef

ID: k-91361790

Week number: 3

Objective(s)

To set up new computers and IT systems.

Result(s) desired

Installing new IT systems for clients and setting up and customizing new PCs for workers.

Work Done

Installing all the required programs, the files required for each task, and setting user accounts with password protection.

Problems/Remarks

Some computers required hardware upgrade before allowing some programs to be installed on them.

Next Objective(s)

To perform interior hardware cleaning.

Supervisor Signature:……………………………. Student Signature:…………………………….

Weekly Project Plan

Student Name: Ayoub Yousef

ID: k-91361790

Week number: 4

Objective(s)

To perform interior hardware cleaning.

Result(s) desired

To be able to clean the interior of a computer and other equipment by getting rid of dust and other debris.

Work Done

Checking and cleaning the interior hardware, including the motherboard and expansion cards.

Problems/Remarks

The major problem was dissembling are reassembling enclosed parts as it was time consuming.

Next Objective(s)

To set up home security systems for clients.

Supervisor Signature:……………………………. Student Signature:…………………………….

Weekly Project Plan

Student Name: Ayoub Yousef

ID: k-91361790

Week number: 5

Objective(s)

To set up home security systems for clients.

Result(s) desired

To install efficient camera surveillance in people’s homes and premises.

Work Done

Installation of surveillance cameras, setting up a recording device and a monitor, and linking wireless cameras to PCs.

Problems/Remarks

It was challenging to prioritize the areas in which to install the surveillance camera, especially where the owner of the home/premises did not have a specific location.

Next Objective(s)

To make a central “surveillance hub”.

Supervisor Signature:……………………………. Student Signature:…………………………….

Weekly Project Plan

Student Name: Ayoub Yousef

ID: k-91361790

Week number: 6

Objective(s)

To make a central “surveillance hub”.

Result(s) desired

To be able to bring all the camera feeds to a single DVR.

Work Done

Setting up central DVR surveillance hub for homes/premises with multiple cameras and setting up custom systems.

Problems/Remarks

Drilling though the walls in already built places to run power and video cables seemed daunting.

Next Objective(s)

To set up and install new network systems for clients.

Supervisor Signature:……………………………. Student Signature:…………………………….

Weekly Project Plan

Student Name: Ayoub Yousef

ID: k-91361790

Week number: 7

Objective(s)

To set up and install new network systems for clients.

Result(s) desired

To be able to set up home or work computer networks for new clients.

Work Done

Installation of networking equipment and connection of network systems in homes and premises.

Problems/Remarks

No problem was encountered.

Next Objective(s)

To trouble shoot and repair hardware problems in network systems.

Supervisor Signature:……………………………. Student Signature:…………………………….

Weekly Project Plan

Student Name: Ayoub Yousef

ID: k-91361790

Week number: 8

Objective(s)

To trouble shoot and repair hardware problems in network systems.

Result(s) desired

To be able to diagnose a network problem from hardware devices such as Ethernet cable, router etc. as well as software problems and fix them.

Work Done

Checking physical connections and other device connections, verifying internet connectivity and other troubleshooting activities to rectify connectivity problems.

Problems/Remarks

No problem encountered.

Next Objective(s)

End of project plan.