Question 1

Use the old solution

Question 2

Amount ($)

Preliminaries

Groundworks

Concrete

Metalwork

Hydraulics

Electrical

Mechanical

Waterproofing

Plasterer

Carpenter Fitout

Ceramic Tiler

External Works

3,524,700

Particulars

Quantity

Amount ($)

Preliminaries

Consultant fees

Authority and establishment

Site clearing

Site fence/hoardings

Direct site labour

Temporary services

Builder’s Margin

Total for Preliminaries

Groundworks

Service trenches, excavation, backfilling and leveling

Total for Groundworks

Concrete

Concrete Basement 2

Concrete Basement 1

Concrete Level 1

Concrete Level 2

Concrete Level 3

Concrete Level 4

Concrete Level 5

Total for Concrete

Masonry Basement 2

Masonry Basement 1

Masonry Level 1

Masonry Level 2

Masonry Level 3

Masonry Level 4

Masonry Level 5

Total for Masonry

Metalwork

Metalwork Basement 2

Metalwork Basement 1

Metalwork level 1 Windows and doors

Metalwork level 2 Windows and Doors

Metalwork level 3 Windows and Doors

Metalwork level 4 Windows and Doors

Metalwork level 5 Windows and Doors

Metalwork level 1 fitout

Metalwork level 2 fitout

Metalwork level 3 fitout

Metalwork level 4 fitout

Metalwork level 5 fitout

Total for Metalwork

Hydraulics

Hydraulics Rough in Sub basement

Hydraulics Rough in Basement 2

Hydraulics Rough in Basement 1

Hydraulic Rough in Level 1

Hydraulic Rough in Level 2

Hydraulic Rough in Level 3

Hydraulic Rough in Level 4

Hydraulic Rough in Level 5

Hydraulics Fit off Basement 2

Hydraulics Fit off Basement 1

Hydraulic Fit off Level 1

Hydraulic Fit off Level 2

Hydraulic Fit off Level 3

Hydraulic Fit off Level 4

Hydraulic Fit off Level 5

Total for Hydraulic

Electrical

Electrical Rough in Below Basement Level

Electrical Rough in Basement 2

Electrical Rough in Basement 1

Electrical Rough in Level 1

Electrical Rough in Level 2

Electrical Rough in Level 3

Electrical Rough in Level 4

Electrical Rough in Level 5

Electrical Fit off Basement 2

Electrical Fit off Basement 1

Electrical Fit off Level 1

Electrical Fit off Level 2

Electrical Fit off Level 3

Electrical Fit off Level 4

Electrical Fit off Level 5

Total for Electrical

Mechanical

Mechanical Rough in Lift

Mechanical Fit off Lift

Mechanical Rough in AC to Basement 2

Mechanical Rough in AC to Basement 1

Mechanical Rough in AC to Level 1

Mechanical Rough in AC to Level 2

Mechanical Rough in AC to Level 3

Mechanical Rough in AC to Level 4

Mechanical Rough in AC to Level 5

Mechanical Fit off Basement 2

Mechanical Fit off Basement 2

Mechanical Fit off to Level 1

Mechanical Fit off to Level 2

Mechanical Fit off to Level 3

Mechanical Fit off to Level 4

Mechanical Fit off to Level 5

Total for Mechanical

Waterproofing

Waterproofing to Level 1

Waterproofing to Level 2

Waterproofing to Level 3

Waterproofing to Level 4

Waterproofing to Level 5

Total for Waterproofing

Range-hoods

Cook-tops gas

Kitchen sinks

Laundry tubs

Kitchens incl granite benchtops

LDS white VC

Vanities

Misc. fittings

Hardware and Joinery

Total for PC Items

Roof installation

Total for Roofer

Plasterer

Plasterer to Basement 2

Plasterer to Basement 1

Plasterer to Level 1

Plasterer to Level 2

Plasterer to Level 3

Plasterer to Level 4

Plasterer to Level 5

Total for Plasterer

Carpenter Fitout

Carpenter Fitout to Basement 2

Carpenter Fitout to Basement 2

Carpenter Fitout to Level 1

Carpenter Fitout to Level 2

Carpenter Fitout to Level 3

Carpenter Fitout to Level 4

Carpenter Fitout to Level 5

Total for Carpenter Fitout

Painter to Basement 2

Painter to Basement 1

Painter to Level 1

Painter to Level 2

Painter to Level 3

Painter to Level 4

Painter to Level 5

Total for Painter

Ceramic Tiler

Ceramic Tiler to Level 1

Ceramic Tiler to Level 2

Ceramic Tiler to Level 3

Ceramic Tiler to Level 4

Ceramic Tiler to Level 5

Total for Ceramic Tiler

Carpet to Level 1

Carpet to Level 2

Carpet to Level 3

Carpet to Level 4

Carpet to Level 5

Total for Carpet

Cleaner to Basement 2

Cleaner to Basement 1

Cleaner to Level 1

Cleaner to Level 2

Cleaner to Level 3

Cleaner to Level 4

Cleaner to Level 5

Total for Cleaner

External Works

All external work

Total for External Work

3,524,700